In February 2010 the MNSE ran the last train around the layout.  Then the layout was going to be fixed up and touched up in preparation for the National Model Railroad Association 75th Annual Convention being held in Milwaukee in July 2010. 

However in March 2010 the owner of the building informed us that a new Barbershop was going to be opening on the first floor and a couple of things would be happening.  One of them included running some drain pipes from 3 free standing sinks in the shop.  These pipes would be running in the layout room.  So we decided to take some precautions by putting the MNSE layout into a Cocoon State. 
As of May 1st the MNSE is still in Cocoon State while we wait for the plumbers to install the drain pipes.  We are hoping to reopen sometime in May 2010 and continue with layout rehab and be ready for the NMRA 75th. 